Vulcan Scheduling Case Studies

Integrated haulage strategy cuts costs

A scheduling study at Tropicana Mine minimised haulage costs, maximised metal production and minimised stockpile rehandle.

Read More

Vulcan Chronos Scheduler

Chronos Scheduler has the flexibility to handle the unique requirements of an operation for storing, manipulating and reporting mine production information.

Read More

Vale schedules with Maptek Chronos

Vale used Chronos Scheduler to track material through stockpiles and feed to the concentration plant at their Itabira operation, improving efficiency and productivity.

Read More