Build and evaluate a variety of mine scenarios to ensure you produce operationally viable plans and schedules.
Learn MoreKeep track of key activities across your processes to continually increase production, efficiency and safety.
Learn MoreThe free quarterly Maptek Forge newsletter includes case studies, product and corporate news.
Maptek blogs cover a range of industry topics, sharing insights from across our global network.
Keep up to date with the latest product solutions and news about Maptek global activities.
An online repository of all Maptek learning resources, from white papers to blogs and case studies.
An overview of Maptek, our products, solutions and operations.
A brief history of Maptek, including milestones of our 40 years of operation.
Information about careers at Maptek and current vacancies.
Find conferences, seminars and tradeshows where Maptek is exhibiting and/or presenting papers.
Discover the features and benefits of Maptek solutions in these overview videos.
Watch webinars on various topics and learn about the latest solutions from Maptek subject matter experts.
Watch tutorials outlining ways to apply various tools. Learn the latest techniques for efficient workflows.
Short bite size videos include tips and tricks for applying common tools and solutions.
Maptek I-Site Studio software contributed to workflow for analysing slope failure in weathered rock in a quarry in New Zealand.
In May 2016, TAGA Engineering Software Ltd flew an unmanned aerial vehicle (UAV) over part of Winstone Aggregates’ Belmont Quarry in the Lower Hutt province to record detailed photographs of localised bench failures.
The aim was to develop a workflow starting with drone photography and concluding with back analysis of the slope failure using their 3D slope analysis program, TSLOPE.
A subset of the large number of UAV images was processed using Pix4D software to generate an ortho-mosaic photograph. A cloud of 1,033,537 points with xyz and rgb values was also generated by Pix4D and loaded into TSLOPE for visualisation.
The quarry produces aggregate for the construction industry from a highly indurated quartzofeldspathic sandstone with interbedded siltstone, known locally as a greywacke. The rock in the upper levels is variably weathered.
The shallow slope failure occurred on an upper level bench slope, and measured about 14m high and 20m wide at the toe.
Slope failures are controlled by rock structure. Intersecting rock fractures form the failure surface exposed towards the top part of the slope face. The failure surface is then assumed to continue towards the toe of the slope, where it is covered by debris.
TAGA needed models of the original topographic surface and the failure surface to back calculate insitu strengths that applied at the time of the failure.
Since TSLOPE cannot produce surfaces from point clouds, TAGA used the specialised Maptek™ I-Site™ Studio tools. The raw UAV data was loaded into I-Site Studio and viewed in 3D (Figure 1).
I-Site can distinguish vegetation and remove selected points from the scene. A user-defined panel indicates a filter direction and a search size parameter to define the underlying ground.
I-Site was then used to construct the two surfaces needed for import into TSLOPE. First, the pre-failure topography was built by removing points involved with the slope failure and constructing a continuous surface across the remaining points.
Further data manipulation allowed modelling of the failure surface, with an assumption that the base of the shear surface intersected the toe of the slope. Figure 2 compares pre and post-slide topography.
From import of point cloud data to production of final modelled surfaces took about two minutes.
The original topography modelled using I-Site Studio was loaded into TSLOPE as the top surface, and the shear failure as the basal surface.
Greywacke material properties were entered, with unit weight (unsaturated) of 20 kN/m3, and Mohr Coulomb parameters – cohesion of 4 kPa and angle of friction of 30°. These estimated numbers reflect the low stresses acting on the failure surface. A three dimensional slope case was then defined, with an assumption that no groundwater pressures applied.
The slope case discretises the model into vertical columns overlying the basal surface, in this case 100 columns across the width (Figures 3 and 4). The darker colour shows the active columns involved in the slope stability calculations.
TSLOPE then provided a solution using Spencer’s method, with a calculated factor of safety of 1.16 (Figure 5). This suggests that the strengths used in the model are a little higher than would have applied at the time of failure.
To understand the range of strengths that would apply at a factor of safety of 1.0, a back analysis of the slope failure was carried out using different combinations of Mohr Coulomb parameters. The cross plot in Figure 6 shows the range of strengths corresponding to different factors of safety.
To further understand shallow slope failures, similar systematic studies are recommended. By aggregating the cross plots, it will be possible to show the range of strengths that should apply to weathered greywacke at shallow depth below ground surface.
Thanks to
Ian Brown, TAGA Engineering Software Ltd